Gastrade takes FID on Alexandroupolis LNG terminal
January 24, 2022
Gastrade took FID for construction of a 4 MTPA LNG terminal in Alexandroupolis (Greece), as part of the Independent Natural Gas System of Alexandroupolis. A 153 500 m3 FSRU, converted from an LNG carrier and operated by GasLog, will be connected to the National Natural Gas Transmission System of Greece with a 28 km long pipeline. The terminal is expected to start operations by the end of 2023. Its regasification capacity is contracted at 50% of its technical capacity. The project has received €167M of public spending.
Edited from Gastrade press release